Japanese secondary aluminium and aluminium alloy production increased by 10.1% to 70,356 tonnes in July from a year earlier, according to Japan Aluminium Alloy Refiners Association. The shipment increased by 11.1% to 70,884 tonnes. The output and shipment increased for 8 months in a row. However, the volume was lower than June by 0.7% for the output and by 2.6% for the shipment due to peaking demand for automobile. The production and shipment level was as low as 71.4% and 70.6% of the figures in July 2008.
The secondary aluminium and aluminium alloy ingot shipment increased for casting and flat product for 2 months in a row through July while the shipment decreased for other applications. The shipment decreased by 4.2% for die casting, by 14.6% for extrusion and by 3.3% for steel while the shipment increased by 1.0% for casting and by 3.1% for flat product.| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Feb | ||||||
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | 31 | |||||
Japan Steel Scrap Composite Prices (Sangyo Press)
2026/03/23| H2 | NewCutting (PRESS) |
| 49000YEN (1000) | 51500YEN (800) |
| 309.11US$ (7) | 324.88US$ (5.77) |
* Average of electric furnaces steel maker's purchasing price in Tokyo, Osaka and Nagoya (per ton)
- JMB Tieup company
- The Korea Metal Journal
- ferro-alloys.com
- Steel on the net
- AMM
- MEPS